Parking lot paving
Premium asphalt solutions for commercial properties, HOAs, and retail centers across Metro Atlanta
What sets us apart
Commercial-grade paving built to last

Asphalt engineered for heavy traffic
We use premium mix designs and proper compaction to ensure your lot withstands years of commercial use. Our work meets or exceeds Georgia DOT specifications for durability and load capacity.

Nights and weekends available
We understand your property must stay operational. BIRAN Paving schedules work around your business hours, including early mornings, evenings, and weekends to minimize tenant and customer impact.

ADA-compliant design and striping
Every parking lot we build meets current ADA accessibility standards with proper spacing, slopes, and striping. We handle all compliance details so your property passes inspection and serves all users safely.
How we build your parking lot
Every project starts with a clear plan. We evaluate your site, design proper drainage, mix premium asphalt, compact it to spec, and finish it right.
Site evaluation and grading
Premium asphalt mix design
Precision compaction and finishing

From quote to completion
Five straightforward steps to your new lot
Request your quote
Call or submit a quote request online
Site assessment and proposal
We visit your property, evaluate conditions, and provide a detailed estimate
We coordinate timing around your business hours
Confirm

Client reviews
What our clients say



Questions
Everything you need to know about parking lot paving
Most parking lots are completed within 3 to 5 business days depending on size and weather. We schedule work during off-hours or weekends to minimize impact on your operations. BIRAN Paving coordinates timing with your property management to ensure zero disruption.
We back all parking lot paving with a 5-year workmanship warranty covering material defects and installation quality. This covers cracking, potholes, and surface failure under normal use. Extended warranties are available for high-traffic commercial properties.
Yes. We design and stripe all parking lots to meet current ADA standards including accessible spaces, ramps, and proper slope. Our team ensures your lot is compliant and inspection-ready from day one.
New asphalt should be sealed after 6 to 12 months, then every 2 to 3 years thereafter. Regular sealcoating extends pavement life by 10 to 15 years and protects against UV damage and water infiltration. We offer maintenance plans tailored to your property.
BIRAN Paving is fully licensed, bonded, and insured with general liability and workers' compensation coverage. We provide certificates of insurance upon request and maintain all required permits for Metro Atlanta work.
Ready to upgrade your lot?
Call 404-703-5685 now or request a fast quote

